...

HomeShopUFH AccessoriesHeating / HVAC Manifold Cabinet

Heating / HVAC Manifold Cabinet

Product Overview

The Heating Manifold Cabinet is designed to house and protect HVAC and heating system manifolds.
Made from high-quality cold-rolled steel with powder coating, it ensures durability, corrosion resistance,
and an aesthetic appearance for residential and commercial installations.

The cabinet allows easy installation of manifolds, valves, actuators, and flow meters, providing organized
and safe piping for underfloor heating, radiator systems, or multi-zone HVAC applications.

Category:

Description

Key Features & Advantages

  • Durable Steel Construction: High-quality cold-rolled steel with powder coating, corrosion-resistant and long-lasting.
  • Protective Housing: Protects manifold and valves from damage and dust, improving system reliability.
  • Wall-Mount or Built-In: Suitable for embedded or surface-mounted installations.
  • Organized Piping: Predefined space for manifold, actuators, flow meters, and control accessories.
  • Easy Maintenance: Removable front panel for quick inspection, adjustment, and servicing.
  • Customizable Sizes: Can accommodate 2–12 loops or multi-zone manifolds based on project requirements.

Applications

  • Underfloor heating systems
  • Radiator heating systems
  • Residential HVAC installations
  • Commercial building heating systems
  • Multi-zone temperature control projects

Technical Specifications

  • Material: Cold-rolled steel with powder coating
  • Color: White, gray, or customizable
  • Dimensions: Customized according to manifold size (standard 400×300×120mm, 600×400×150mm etc.)
  • Connection: Suitable for 1/2”–1 1/2” manifold connections
  • Installation: Wall-mounted or embedded
  • Compatible with: Stainless steel manifolds, valves, actuators, flow meters

Installation Notes

  • Ensure the cabinet is installed in a dry, accessible location for inspection and maintenance.
  • Verify that the manifold fits correctly and all inlet/outlet connections are aligned.
  • Secure the cabinet firmly to the wall or embed it into the wall structure.
  • After installation, perform a pressure test to ensure no leakage in the system.
If you have any needs, please contact us immediately for a quick quote.
Please enable JavaScript in your browser to complete this form.
Name
Click or drag a file to this area to upload.
Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.