...
TELIN / RADIANT FLOOR SYSTEMS

Stainless
Steel
Manifold

A clean flow-distribution header for balanced underfloor heating circuits.

Built for radiant floor heating systems, the stainless steel manifold combines visible flow meters, return-side actuator positions, isolation valves and a serviceable mounting frame in one organized assembly.

Stainless steelRadiant floor heatingFlow distributionVisible flow metersPressure gauge option
TELIN stainless steel radiant floor heating manifold
Product view · stainless headers with flow meters, return caps and isolation valves
AT A GLANCE

Make every circuit visible.

The manifold acts as the distribution point between the heat source and individual floor-heating loops. Clear flow indication and accessible adjustment points help installers balance the system and keep future service work organized.

Stainless steel manifold with red flow meters

Flow at a glance

Transparent flow-meter bodies provide a quick visual reference during commissioning and balancing.

Radiant floor manifold installation

Organized installation

Paired headers, mounting brackets and end assemblies support a clean manifold cabinet layout.

Manifold isolation valve and end detail

Service-ready details

End valves, drain points and isolation controls make the distribution assembly easier to commission and maintain.

TECHNICAL PROFILE

Product specifications

Product typeRadiant floor heating manifold
MaterialStainless steel
ApplicationRadiant floor heating
Heating systemUnderfloor hydronic system
Visible featuresFlow meters and pressure gauge
RelayNone / N/A
VoltageNone / N/A
ConfigurationMulti-circuit distribution header
INSTALLATION FLOW

From header to room loop

Choose the circuit count and connection format according to the floor plan, loop length, required flow and cabinet space. Final system design should be confirmed by the installer or heating engineer.

  • 01 Position the manifold at an accessible service height
  • 02 Connect supply and return headers to the primary circuit
  • 03 Connect each floor-heating loop to its matching outlet
  • 04 Fill, purge air and check every connection
  • 05 Balance flow meters before final commissioning
PRODUCT VIEWS

Designed for clear system planning

Confirm circuit count, connection size, pressure gauge arrangement and actuator compatibility against the project design before ordering.

PROJECT INQUIRY

Specify your manifold assembly

Send the number of circuits, connection size, flow requirements and project quantity to the TELIN team.

Send an Inquiry

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.